2024 BMW M4 | VIN WBS43AZ07RCN61219
About This Vehicle
This 2024 BMW M4 was sold at Copart auction on December 10, 2024 . It has a Gas engine with Automatic transmission and All drivetrain. The vehicle has a recorded mileage of 10310.
Legal Disclaimer
The information provided is for reference only. While we strive for accuracy, we cannot guarantee all information is complete or correct. Verify all details with relevant authorities before making decisions based on this data.
Auction record for 2024 BMW M4 VIN WBS43AZ07RCN61219
This 2024 BMW M4 from USA sold on December 10, 2024 through Copart for USD 91,818. Recorded mileage: 10310. Condition reported as run_and_drives. Damage on file: undercarriage. Powertrain: gas engine with automatic transmission, all drive. Lot reference 74003684.
Compare against other BMW M4 sales, browse recent Copart lots, or see all vehicles auctioned in USA. Decode this VIN’s structural parts.
Other 2024 BMW M4 records on file
- VIN WBA13AR04RCP07485 BMW M4 · Copart
More records sold through Copart
- VIN WBS43AZ09NCK26831 2022 BMW M4
- VIN WBS33BA05NCJ12693 2022 BMW M4
Record last updated December 12, 2024.