2022 BMW M4 | VIN WBS43AZ0XNCL07336
About This Vehicle
This 2022 BMW M4 was sold at Copart auction on March 25, 2025 . It has a Gas engine with Automatic transmission and All drivetrain. The vehicle has a recorded mileage of 16107.
Legal Disclaimer
The information provided is for reference only. While we strive for accuracy, we cannot guarantee all information is complete or correct. Verify all details with relevant authorities before making decisions based on this data.
Auction record for 2022 BMW M4 VIN WBS43AZ0XNCL07336
This 2022 BMW M4 from USA sold on March 25, 2025 through Copart for USD 71,691. Recorded mileage: 16107. Condition reported as engine_starts. Damage on file: front end, undercarriage. Powertrain: gas engine with automatic transmission, all drive. Lot reference 42298385.
Compare against other BMW M4 sales, browse recent Copart lots, or see all vehicles auctioned in USA. Decode this VIN’s structural parts.
Other BMW M4 records on file
- VIN WBS43AZ05PCL79290 2023 BMW M4 · Copart
- VIN WBS3R9C59FK334631 2015 BMW M4 · Copart
- VIN WBS4Z9106JED21759 2018 BMW M4 · Encar
Record last updated March 28, 2025.