2023 BMW M4 | VIN WBS43AZ0XPCM20531
About This Vehicle
This 2023 BMW M4 was sold at Copart auction on December 10, 2024 . It has a Gas engine with Automatic transmission and All drivetrain. The vehicle has a recorded mileage of 30508.
Legal Disclaimer
The information provided is for reference only. While we strive for accuracy, we cannot guarantee all information is complete or correct. Verify all details with relevant authorities before making decisions based on this data.
Auction record for 2023 BMW M4 VIN WBS43AZ0XPCM20531
This 2023 BMW M4 from USA sold on December 10, 2024 through Copart for USD 74,746. Recorded mileage: 30508. Condition reported as run_and_drives. Damage on file: front end. Powertrain: gas engine with automatic transmission, all drive. Lot reference 79534564.
Compare against other BMW M4 sales, browse recent Copart lots, or see all vehicles auctioned in USA. Decode this VIN’s structural parts.
Other BMW M4 records on file
- VIN WBS3R9C55FK331225 2015 BMW M4 · Copart
- VIN WBS3U9C5XGP970025 2016 BMW M4 · Copart
- VIN WBS3S7C08LAH85101 2020 BMW M4 · Copart
Record last updated December 12, 2024.